Eco-friendly Feature Smooth 1.5mm HDPE Geomembrane Liner
Basic Info
Model No.: TH-001
Product Description
It is extremely important to anchor your HDPE Pond Liner in place to prevent the liner from sliding down the slope and into the pond. The most common way to anchor the liner is with an "anchor trench," typically 1 foot wide by 1 foot deep, or larger. The most common variation on the anchor trench is the "anchor shelf or bench." Rather than going down into the ground, the shelf is a flat horizontal (or slightly canted back) area about 4 feet wide that the liner is laid onto, then buried. This method is more popular as the size of the pond gets larger. It also tends to be a little more "forgiving" when attempting to grow grass right down to the water`s edge. Either method is perfectly acceptable and commonly used. The deeper the pond the larger the anchor trench should be.
Our main products including geotextile, geomembrane hdpe, geomembrane, composite geomembrane, waterproof board, GCL, green roof drainage board, compound drainage net, geogrid, geonet, geocell and so on.
Our company has passed ISO9001:2000 international quality system certification, ISO14001:2004 Environment Management System Certification and GB/T28001:2001 Vocationl Healty and Safety System Certification. Besides, it has successfully passed on-side check on production license, and has gained National Industrial Production Protection Lincense and special water-proof qualification. At present, we have inport and export rights, and we are the member of Chinese Technical Association on Geosythetics and hss been recognized as a Provincial-level Enterprise Abiding by the Contract, keeping promise for several succsssive years. Besides, we arwarded the titles of Shandong Famous Brand.
Geomembrane Technical Data
No. Item Test Value 0.5mm 0.75mm 1.0 mm 1.25 mm 1.5 mm 1.8mm 2.0mm 2.5 mm 3.0mm 1 Minimum Density(g/cm³) 0.94 2 Strength at yield, N/mm 7 11 15 18 23 27 30 38 45 3 Strength at break ,N/mm 10 21 28 33 43 51 57 71 85 4 Elongation at yield,% 13 5 Elongation at break,% 700 6 Tear Resistance N 56 93 125 156 187 219 249 311 373 7 Puncture Resistance N 120 263 352 440 530 618 703 881 1059 8 Stress Crack Resistance, hrs 400 9 Carbon Black Content, % 2.0-3.0 Carbon Black Dispersion 1 or 2 10 Standard OTI Min 100 High Pressure OTI Min 400 11 Impact Cold Crack at -70°C Pass 12 Water vapor permeability(g.cm/cm2 .s.Pa) ≤1.0×10-13 13 Dimensional Stability (%) ±2
PVC geomembrane parameter
Items | I | II |
Tensile Strength Mpa ≥ | 8.0 | 12.0 |
Elongation at Break % | 200 | 250 |
Size change rate in heat treatment % | 3.0 | 2.0 |
Bending low Temperature °C | -20°C | -25°C |
Anti-penetrating | Not leaking | |
Impermeability | Impermeable |
Geomembrane Application
- Environmental protection, environmental hygiene (such as garbage landfill site, treatment of sewage, containment of poisonous or harmful wastes, hazardous warehouse, industry wastes, construction & explosive rubbish, etc)
- Water conservancy (such as waterproofing, stopping up leak, reinforcement for lake, river, channels, tunnels, dams and reservoirs; vertical wall with core, slope protection, etc)
- Municipal engineering (expressway, subway, underground engineering of building; and liner of roof pool, roof garden's waterproofing, sewage channel, etc)
- Garden (backing & slope protection of artificial lake, pool, golf course's pond)
- Petrochemicals (liner secondary lining of chemical reeaction tank and deposit tank from chemical plant & refinery; seepage control of oil tank from gas station)
- Mining (backing seepage of washing pond, heap leaching pond, ashery, dissolved pond, deposit pond from the stack and tailing)
- Traffic facilities (highway foundation reinforcement, culvert stopping up leak)
- Agriculture (stolling up leak for reservoirs, drinking pools, storage ponds and irrigation system)
- Aquaculture industry (seepage control for sea cucumber circle's slope protection, liner of fish pool & shrimp pond)
- Seepage, corrosion, leaks control & reinforcement for other facility, leachate collection
- Temporary container structure, prefabrication of special parts
Production Equipment & Process
The major production facilities include three-layer construction film blow machine, calendering method geomembrane production line, the first company to introduce 8.5m width geotextile production linb, 7m width compound gemombrane production line, GCL production line as well as the patent technology first 3m width forming in only one time drain board production line to produce a variety og geosynthetics.
Service
1) High-quality and professional welding construction teams
With the spirt of flawless, sincere love concept, Tianhai creat a high-quality welding construction team, and we have more than 60 sets welder imported from America, Switzerland and gained waterproof qualification.
2) Strict controling process
For each project, customer, according to the actual stituation from every link in the production, transportation, cosntruction, aftermarket, carried out a careful and meticulous arrangements, and a personal full service tracking at any time to meet our customer's requirements.
Packing & Shipping
Why Choose Us?
Quality is our life, it must be thoroughtly understood and executived by each employees. We guarantee the geomembrane circular tanks for aquaculture of composite geomembrane applied the production of raw materials by our close cooperation with the manufacturer of raw material and strick materials into plant inspection procedures. Advanced equipment and experienced, skilled operator, to creat a stable high quality products.
Indenpendent QC department could do inspection for each volume product before delivery, to ensure that everyone of the factory product can meet standards by tight system control operations, maximize our quality to meet customer's requirements. And has been recognized by the international organization for standardization though the ISO9001:2000 certification, our quality control level meets the international standard.
Product Categories : Waterproof Rolls > ECB Waterproofing Roll Material